March 1, 2013
Technical Report (NI 43-101 compliant) Preliminary Economic Assessment
Authier Lithium Property, Abitibi, Quebec, Canada - For Glen Eagle Resources Inc.
Prepared by Maxime Dupéré, P.Geo., Jonathan Gagné, Eng., Gaston Gagnon, Eng., from SGS Canada Inc. and Florent Baril, Eng., from Burnegeme Inc.
View Report
|
August 16, 2012
Technical Review (NI 43-101 compliant) and Evaluation of the Exploration Potential of the "LAC CHIBOUGAMAU" Mining Properties in McKenzie, Roy, Obalski and Lemoine Townships, Abitibi Mining District, Province of Quebec
Prepared by Claude P. Larouche, B.Sc. Eng., M.Sc., Geol., ing. (OIQ) - Ovalbay Geological Services Inc.
View Report |
August 15, 2012
Technical Review (NI 43-101 compliant) & Evaluation of the Exploration Potential on the BERRIGAN Gold-Zinc-Silver Project, McKenzie Township, Chibougamau, Abitibi Mining District, Province of Quebec (Amended Version)
Prepared by Claude P. Larouche, B.Sc. Eng., M.Sc., Geol., ing. (OIQ) - Ovalbay Geological Services Inc.
View Report
|
April 16, 2012
A Preliminary Economic Assessment for the Timmins Talc-Magnesite Deposit, Timmins, Ontario CANADA
Prepared by B. Terrence Hennessey, P.Geo., J. Spooner, P.Geo., C. Jacobs, C.Eng., MIMMM, D. Anderson, MMSA, T. Hayes, P.Eng., D.Hall, P.Eng., L. Castro, P.Eng., K. Bocking, P.Eng. - Micon International Limited and Jacobs Minerals Canada Inc.
View Report
A preliminary economic assessment (PEA) should not be considered to be a pre-feasibility or feasibility study, as the economics and technical viability of the project has not been conclusively demonstrated at publication. The PEA is preliminary in nature and includes inferred and indicated mineral resources that are considered not to have the economic considerations applied to them that would enable them to be categorized as mineral reserves without further infill drilling. Mineral resources are not mineral reserve and do not have demonstrated economic viability. Furthermore, there is no certainty that the project will be realized nor realized as indicated in the PEA. |
March 21, 2012
NI 43-101 Technical Report on the Mineral Resource Estimate for the Magusi Project, Abitibi Region, Canada for Mag Copper Ltd.
Prepared by Bernard Salmon, ing., Holger Krutzelmann, P.Eng. - Roscoe Postle Associates Inc.
View Report |
October 20, 2011
Technical Report and Mineral Resource Estimate Update for the Duquesne-Ottoman Property, Quebec, Canada for Xmet Inc. Prepared by David Power-Fardy, M.Sc, P.Geo., Senior Geologist and Kurt Breede, P.Eng., Senior Resource Engineer - Watts, Griffis and McOuat
View Report
|
February 24, 2010
Technical Report on the Initial Mineral Resource Estimate for the Timmins Talc-Magnesite Deposit, Ontario - NI 43-101
Prepared by Reno Pressacco, M.Sc. (A), P.Geo., David Hall, P.Eng., and Peimeng Ling, P. Eng. - Micon International Limited
View Report
|
February 2008
Technical Report for the Mineral Resource Estimate, Ironwood Project, Cadillac Township, Quebec (NTS 32D/01)
Pandora-Wood Joint Venture - Globex Mining Enterprises Inc. and Queeston Mining Inc.
Prepared by Reno Pressacco, M.Sc (A), P. Geo,